2 September 2009

Lanyon Valley Woes

| LanyonValley1
Join the conversation
27

The old Lanyon Valley connundrum persists. Hopefully Minister Hargreaves can give the contractors building our bigger better Tharwa Drive a bit of a heave-ho. 6 months of road works… actually, I think the work started November 2008, is taking its toll on the community. We have to leave for work/the school run about 40 minutes earlier than usual, because fellow Lanyon Valley residents have given up on using the constricted Tharwa Drive bomb site. They rat run through Gordon… causing locals to face interminable delays getting out of the ‘burb.

At least our fellow Valley residents have learnt to be nice folks, and allow each other to merge nicely at T intersections and the like. Minister Hargreaves assures me it will all be finished by September.

It’s September 2, John.

Join the conversation

27
All Comments
  • All Comments
  • Website Comments
LatestOldest
LanyonValley18:06 am 23 Sep 09

Not finished.

LanyonValley18:14 pm 15 Sep 09

September 15 has passed, and the road is unfinished.

Bronto said :

goose said :

The whole thing is a joke.

I feel for you Goose 🙂

“It doesnt take a long neck to be a goose…….”

The other thing i missed on mentioning is that the Chrincicle mentioned that the road would be finished by the 15th which is only next Tuesday.

Its close, but not chat close me thinks.

goose said :

The whole thing is a joke.

I feel for you Goose 🙂

LanyonValley18:29 pm 04 Sep 09

Cameron said :

At least, unlike the GDE, after all the piss farting around we’ll have a dual carriageway.

Yes.

At least, unlike the GDE, after all the piss farting around we’ll have a dual carriageway.

LanyonValley112:36 pm 04 Sep 09

Thanks for the comments. Variety of comments.

Minister Hargeaves remains committed to the Lanyon Valley, last time I looked, as member for Brindabella. Actively engaged in Lanyon valley affairs. Campaigned strongly as an advocate of our concerns. Is a member of the current Cabinet, and perhaps has the ear of the Chief Minister who does have responsibility for roads.

Now that insignificant trivia is out of the way…

John Hargreaves told me he’d called his department and they explained to him that there were drainage issues not identified early on in the project, which in fact lead to significant delays back in June. He also mentioned that the issue of folks running through the back streets of Gordon was well known, and that short of building new roundabouts (temporary) at the site of the new traffic bottlenecks, there was little that could be done.

I accept all that.

I guess its frustrating for all concerned.

And, will it fix the issues that we had, priot to the duplication?

Time will tell. Look at the GDE, particularly near Black Mtn.

And for what its worth, I had sympathy and a little empathy for my cousins in Gunghalin, trying to commute to Civic over a very lengthy time… even thought I don’t inhabit that region.

Empathy and sympathy for other people’s concerns is a good thing.

Jumping on the righteous, supercilious technicality bandwagon in relation to the minutae of government structures is not useful.

I am looking forward to my new road.

Thanks.

djk said :

Cameron said :

…the need to widen the existing lane in order to accommodate a cycle lane (despite there being a bike path running right alongside Tharwa Dr).

anyone care to enlighten me as to why this is required? there is a bike path literally 3 metres away from the road.

has it actually been confirmed that this is what is happening?

In an attempt to calm the bike hype, it appears to me (although I may be incorrect), that Tharwa Drive is an extension of (in the form of duplication) Drakeford Drive. Drakeford Drive also has hard shoulders, that were included in the building of it, I guess originally as a break down lane. The notion of on road cycle lanes (love it or hate it)didnt come along until way after Drakeford Drive was built. It seems to me that the duplication of Tharwa Drive is what I have pointed out, an extension of Drakeford Drive, so why wouldnt they build a hard shoulder as well, regardless of whether it will be used as a cycle lane and/or break down lane. Personally, I am more interested in the time being allocated to building so many bus stops (with shelters)on stretches of the road where there will be little use (between the 2 new bridges). A good idea would be to install shelters elsewhere in the Lanyon Valley, so we have more than 5 shelters for the whole of the valley. I mean, fancy sticking 10 bus shelters in the Hyperdome precinct, where you already have easy access to shelter anyway.

The whole thing is a joke.

This road definitely needs a hard shoulder. Personally, I’d rather it was not also designated a bike lane. Then there’s no obligation to cycle in it when there is no need.

Who here wants such roads to stop moving when someone breaks down?

I too stirred TAMS about the lack of information about this major piece of work on their website. Only in July (from memory) did anything go up on their site. The project had been going for more than 6 months by that stage.
That was after the evening a contractor left a lane blocked off into the Johnson drive roundabout and caused a huge traffic jam.

I guessed that it was for a bike lane when I saw them widening it. The confirmation was that they’ve painted in a bike lane in the northbound section between Box Hill/Woodcock and Mentone.

As I’m sure you can imagine, not only is widening the road to accommodate it a fairly significant pain (not to mention time consuming), but having to widen the existing bridges either side of the Drakeford Dr/Tharwa Dr roundabout as well just makes things ridiculous. We’ve added christ knows how long to the cost and timeframe of this project to cater to the few who ride out of the Lanyon valley. As you point out (and as I had done also) djk, there is a bike path right next to the road – from the Lanyon shops all the way up to and past Drakeford Dr.

Cameron said :

…the need to widen the existing lane in order to accommodate a cycle lane (despite there being a bike path running right alongside Tharwa Dr).

anyone care to enlighten me as to why this is required? there is a bike path literally 3 metres away from the road.

has it actually been confirmed that this is what is happening?

Information, about a gov project? Cameron you are dreaming.

I’d been in touch with TAMS months ago about why there was no information on their website re: the Tharwa Dr duplication – their response was that the information should have been there, but that it wasn’t. Helpful.

In any event, construction didn’t begin in November 2008 – they put signs up all along Tharwa Dr in the lead up to the election stating that it would, no doubt an attempt to be seen to be doing something about it. From memory, it actually started in January or February of 2009.

Seems to me that the duplication is taking so long for two reasons – the need to drop in two bridges, either side of the Drakeford Dr / Tharwa Dr roundabout, and the need to widen the existing lane in order to accommodate a cycle lane (despite there being a bike path running right alongside Tharwa Dr).

I’d be incredibly (and pleasantly) surprised if things were finished by the end of this month – but whether it is or it isn’t, the upgrade itself is way overdue (thanks to Save the Ridge for causing funds to be diverted from this project to fight their pointless campaign to stop the GDE) and the length of time it is taking to get done is ridiculous. Don’t even get me started on the total lack of information available regarding the project or the unwillingness of departmental staff to divulge it.

The contractor for this duplication should NEVER be awarded another contract EVER AGAIN!

captainwhorebags said :

It could have been quicker if it was a simple duplication, however the existing road was widened to accomodate cycle lanes.

This would not have delayed it long, mayby a day or two on each section.

As mentioned building two bridges has delayed the process, also adding 4 new bus stops.

It also appears that Actew held up proceedings too as when the lights were being erected there was no one else was working on the road.

Welcome to Worksafe & OH&S people. I would rather have safe workers than dead workers.

knockknock-eggman12:27 pm 03 Sep 09

Out of curiosity, who pays for cycle lanes ? I dont see rego stickers on bicyceles….

KB1971 said :

Gobbo, LanyonValley1 is talking about Tharwa Drive (at the end of Drakeford Drive), not Lanyon Drive from jerra to Hume 🙂

My mistake. Sorry.

The other information is still relevant. Speak to Jon not John, or better yet, the Department.

The web-site suggests that the Department is still going for a September completion.

http://www.tams.act.gov.au/move/roads/construction_and_maintenance/construction_projects/tharwa_drive_duplication

It did appeaar to take them quite a while to put the bridges on & what lanes have been opened were a rush job. If you travel down Drakeford Drvive/Tharwa Drive you will notice that the left lane is higher then the right lane & the depth changes for both lanes every so often. Most likely the cheapest contractor.

The same goes for Belconnen Town Centre, it was meant to open the Monday after ANZAC Day, work was only just finished a month later. But more work is still bein done to some of the Bus Stations these last few weeks.

captainwhorebags9:54 am 03 Sep 09

It could have been quicker if it was a simple duplication, however the existing road was widened to accomodate cycle lanes.

Gobbo, LanyonValley1 is talking about Tharwa Drive (at the end of Drakeford Drive), not Lanyon Drive from jerra to Hume 🙂

OK, there is a congestion problem at the moment, the roadworks have maybe gone on a bit too long.

Do you think you will think about it once its finished?

Probably not. 1 year of roadworks will benifit you for the next however long you live in the area, be it 5 minutes or 20 years.

40 minutes is nothing compared to larger cities.

Maybe ride your bike?

I do & I pass all the cars that have one person in them & beat them through the roadworks.

Or take a bus, you can sit back, relax & have a sleep if you want with the 40 minutes.

All I am saying is relax, you will only be inconvenienced for a short time in your life & you will forget about it pretty soon.

Unfortunately the road fairies were not available to do the work, so we have to put up with human contractors.

Hmmm. When my moderated comment gets through there, there seems to be informatin stuffed up in the post.

Here is what I was trying to link to:

http://www.tams.act.gov.au/move/lanyon_drive_upgrade
Lanyon Drive Upgrade
Background:

Roads ACT and the NSW Roads and Traffic Authority (RTA) have developed a preferred option for the upgrade of Lanyon Drive between Tompsitt Drive and the Monaro Highway from a two lane road to a four lane divided road with cycle lanes in each direction.

Construction of Stage 1 from the Monaro Highway to Sheppard Street is now complete.

Stage 2 which is scheduled to start construction later this year, will complete the duplication of the road between Sheppard Street in the ACT and Tompsitt Drive in NSW, a total distance of 1.4 kilometres.

This project is funded by the Federal, ACT and NSW governments and is expected to be completed by early 2011.

And it is still 3 September, and I am now a three-post nutjob.

However, after checking the TaMS web-stie, I find that there is LOTS of information about the upgrade.

Tis amazing what you can find out if you look.

Here is your informatin LanyonValley.

Now you can go and complaint to the Chief about the project. 🙂

Lanyon Drive Upgrade
Background:

Roads ACT and the NSW Roads and Traffic Authority (RTA) have developed a preferred option for the upgrade of Lanyon Drive between Tompsitt Drive and the Monaro Highway from a two lane road to a four lane divided road with cycle lanes in each direction.

Construction of Stage 1 from the Monaro Highway to Sheppard Street is now complete.

Stage 2 which is scheduled to start construction later this year, will complete the duplication of the road between Sheppard Street in the ACT and Tompsitt Drive in NSW, a total distance of 1.4 kilometres.

This project is funded by the Federal, ACT and NSW governments and is expected to be completed by early 2011.

http://www.tams.act.gov.au/move/lanyon_drive_upgrade

LanyonValley1 – You do realise that Minister Hargreaves has not been responsible for roads since the last election don’t you?

Perhaps you should seek your reassurances from Chief Minister Stanhope.

And to continue the date call … it’s September 3, Jon.