6 September 2020

Empire Global lodges plans for 146 units on Greenway site

| Ian Bushnell
Join the conversation
27
The Greenway proposal

An artist’s impression of the proposal. It comes with a rooftop garden. Images: Stewart Architecture.

Empire Global has lodged plans for a $23 million, eight-storey, mixed-use apartment block in Greenway that will add 146 units to the area, but it faces opposition from nearby residents upset at the building height and the parking and traffic impacts.

According to the pre-DA consultation comment, some also doubt whether there is sufficient demand to warrant the development.

The proposal is for a rear section of Block 2 Section 57 at 305 Anketell Street, fronting Limburg Way near the lake. The block is mostly cleared of vegetation and consists of a Wilson’s car park and Margaret Guilfoyle House, which will be retained, as will half of the car park.

This will be Stage 1 of development on the 7279 square metre site, which was the subject of a previous proposal from the same developer in 2017 for 375 units over four buildings of seven and eight storeys and 400 car spaces.

The DA says Empire Global is now staging the development as demand needs.

Bunnings lies to the south, Tuggeranong Square to the west, the police station to the west and Lake Tuggeranong to the east.

Stage 1 of the proposal

Another view of the proposal, Stage 1 of an overall development plan for the block.

Designed by Stewart Architecture, the scaled-back development includes a part seven and part eight-storey residential block comprising 16 studio units, 22 one-bedroom units, 85 one-bedroom + study units, seven two-bedroom units, and 16 two-bedroom + study units. Fifteen units will be accessible.

The ground floor will be given over to shops such as a convenience store for residents to activate the street frontage.

The building steps down towards the south, and a right of way easement of about 20 metres separates the southern boundary of the site from the neighbouring building.

Strips of open space are planned on Reed Street and Limburg Way, while a rooftop garden is proposed.

Two levels of basement parking will provide 160 spaces, including 15 accessible, as well as cages for bicycles.

Access will be via a two-way vehicle through lane with verge entries from Reed Street and Limburg Way. Waste trucks will enter from Reed Street and exit to Limburg Way.

The site in Greenway

The site in front of Margaret Guilfoyle House where the development is planned.

The traffic report estimates the daily traffic generation of the site, including the new residential block and retained commercial office area, at 1342 vehicles per day and 85 an hour in peak periods, which the reports says can be accommodated.

Despite concerns the development will increase pressures on parking in the area, the traffic reports note that the number of spaces is more than required and that parking also be available in the car park retained on site.

According to the community consultation, residents in the neighbouring SQ1 complex fear they will be overshadowed, and their views and privacy affected.

But the DA’s shadow diagrams show limited overshadowing of the SQ1 development allowing reasonable levels of sunlight in the morning and afternoons.

It also says the building height is within the precinct Code and that the Territory Plan does not consider a ‘right to a view’.

Nearby residents also fear development creep and believe community facilities would be a better use for the site.

The proponent also wants to change the lease to allow residential use.

Join the conversation

27
All Comments
  • All Comments
  • Website Comments
LatestOldest

The design isn’t breathtaking, but these will be fairly affordable so I think for the price point it looks okay.

The part I can’t get over is the residents at SQ1 complaining about views and overshadowing… have they forgotten what building they live in?

If people want better design and better quality then they should support the smaller boutique developers pushing envelope. But this usually costs little extra than the norm. Unfortunately people just go with the cheapest they can find and so these mediocre developments continue on.

It’s already a shemozzle around the roads in that zone at peak hour. I’m OK for them to Build extra housing in Tuggeranong (it’s needed) but please also ensure there is adequate infrastructure to support the additional people.

Satisfactory Infrastructure and amenities are sadly lacking in the area.

I encourage everyone to go onto the ACT Planning website and let them know your concerns – traffic, lack of parking, overshadowing etc. Unfortunately these people sit in their offices and make decisions on unrealistic reports that are presented to them. They should come out and see the real situation. Firstly, as a visitor, they will be able to experience the trouble of getting a parking spot, first hand.

Daily Digest

Want the best Canberra news delivered daily? Every day we package the most popular Riotact stories and send them straight to your inbox. Sign-up now for trusted local news that will never be behind a paywall.

By submitting your email address you are agreeing to Region Group's terms and conditions and privacy policy.