I have noticed one of the signs promoting the flyover at Piallago Av at the airport now has a red tape over it (similar to a Sold By sign in real estate) with a tick saying “Now Complete”.
Sure, the floyover is open for traffic but it is in no way complete.
It must be an attempt to claim the project finished in March as the sign stated.
Now for any astute observer, the reason the flyover is not complete is that the surface at either end of the flyover is not complete (there is still another layer of hotmix to go), the lane markings are still only temporary, there are two off-ramps that are still closed, and the roadwork speed limits are still imposed.
Just curious as to what others think about claiming something is complete when in fact it isn’t.