Another road works thread!

By buzz819 - 7 July 2010 24

Of late, just about every major road in Canberra has been undergoing road works, this in itself can be a bit of a pain, but I look forward to it all being complete and Canberra being able to grow.

I don’t know how long it has been like this, but I drove through the Glenloch Interchange today, heading south, and found that they had opened up an extra lane for south bound traffic, making it so the northerners do not have to fight to win at the from one lane!

Colour me impressed and well done to the Road Workers who have been working their guts out in this cold winter that we are having in the ACT, credit where credit is due.

Hopefully all the bridges can be done in a timely manner and the debacle known as the GDE can be completed!

What’s Your opinion?


Post a comment
Please login to post your comments, or connect with
24 Responses to
Another road works thread!
bd84 3:36 pm 07 Jul 10

It would be good if they signposted that the lane coming from the City off Parkes Way now merges into the lanes from Caswell Dr just before the Lady Denman Dr exit, rather than getting a surprise in the dark when the lane ends with no warning.

astrojax 2:26 pm 07 Jul 10

i too wanted to thank the lovely smiling chap on the roadworks i went through yesterday, helping old ladies and making the traffic flow smoothly; but his hair was untidy and that’s a disgrace!

he should be sacked and someone should write to the government to alert the chief miser that he should spend more on worker hygeine and appearance and less on monoliths dedicated to himself in the name of art, and make sure those lycra clad heroes don’t get in everyone’s way barging across intersections like they have a right to be on the public road, the public menace. so i won’t say nice things until the darkness of the new asphalt is lightened about three shades of grey and the whol;e road moved about three inches to the left where the sunset won’t interfere with my capacity to preen in the rear view mirrow when i drive home, talking to my cousin on the mobile, drunk. oh, and i saw a duck. who was overcharged for his pizza last week.

did i miss anything, spectra?

TheObserver 1:49 pm 07 Jul 10

I don’t suppose anyone has thought through the implications of the widening of Barry Drive, the duplication of the GDE (which will not extend from where it joins Parkes Way) which will have the net effect of getting everyone to the known bottlenecks about 15 seconds faster and thus increase the delays by at least more than 15 minutes. I would guess that delays only increased with the GDE – rather than ameliorated them. Maybe “save the ridge” had a point after all.

Hugh Lews 1:19 pm 07 Jul 10

Spectra said :

This isn’t a site for complementing the government or its employees or contractors.

Fixed.

This isn’t an “instance” for complementing the government or its employees or contractors.

housebound 12:49 pm 07 Jul 10

Hmmm, seen that second GDE bridge over Belconnen Way? It has had a LOT of scaffolding for a very long time, with no real sign of progress.

lobster 12:21 pm 07 Jul 10

I think they started all the roadworks a couple of months ago because of the same reason that every government department started spending up big.
End of Financial Year.

Gungahlin Al 11:40 am 07 Jul 10

Flemington Rd (partial) duplication is coming together fairly well. Will be sweet when done – until we get to the bottleneck at each end…

Interestingly, had to go down to Woden 4 days running recently. And even with the crawls at each merge point, it was still faster to get to the centre of Woden than centre of Civic on Northbourne. GDE will be a great run when 4 lanes all the way. Damn shame John Hargreaves knew so much better and wouldn’t listen to anyone – people could have been enjoying that for two years already.

Genie 11:31 am 07 Jul 10

Mothy said :

Prob worth a pat on the back too for the near completion of the citybound Barry Drive works – with lines now marked can’t be far off the bus/bike lanes being open and the speed restrictions coming off the other two lanes.

Worth a pat on the back ?? I doubt it. I’m going to complain ! This should have been finished weeks ago.

Everytime I would drive down Barry Drive to work, I would have a joke with my partner as to how many people were actually working that morning. It usually totaled about 2-3 with the rest standing or sitting around drinking coffee or having ciggies etc. (And yes they are entitled to a smoko break but not at 8am in the morning) I have also traveled down that stretch of road at various other times of the day to see the exact same thing.. My tax money REAL hard at work.

Im all for improving the roads… Just hurry up !!!

grump 10:45 am 07 Jul 10

thanks Mothy, forgot to mention Barry Drive works! 😉

Mothy 10:18 am 07 Jul 10

Prob worth a pat on the back too for the near completion of the citybound Barry Drive works – with lines now marked can’t be far off the bus/bike lanes being open and the speed restrictions coming off the other two lanes.

Mothy 10:16 am 07 Jul 10

Must have only opened that lane this week.

North to South Through Glenloch last Friday took 45 minutes (no, not the whole GDE, just Caswell Drive (backed up to Bandjalong Cres overpass) to level with the Zoo on the Parkway.

There were 2 Form 1 Lanes – one for the Tuggeranong/Woden Bound traffic off William Hovell, which then fed into the one for the Southbound traffic off Parkes Way.

Is the extra lane solving both problems?

Spectra 10:16 am 07 Jul 10

Colour me impressed and well done to the Road Workers who have been working their guts out in this cold winter that we are having in the ACT, credit where credit is due.

No, no, no. You’re doing it all wrong. This isn’t a site for complementing the government or its employees or contractors. You’ve got to nitpick, complain and grumble about every bit of incompetence, perceived or otherwise (see grump’s post above). Now go away, read some other threads and don’t come back and post again until you can find at least 10 things wrong with the work done thus far, the people doing it, or the colour of the asphalt or concrete. Bonus points are awarded for mentioning cyclists, public art, Charnwood, Kambah, or giving a minister an amusing title like Comrade Stanhopeless.

😉

icantbelieveitsnotbu 9:45 am 07 Jul 10

A cunning plan by the ACT Government… Start them all now, piss everyone off for a year or so and then have all the roadworks complete just in time for an election?

grump 9:18 am 07 Jul 10

colour me impressed if they hired more than 2 men and an arthritic dog to do all the work and stopped shuffling the said 3 between jobs for the illusion of progress.

Has any roadwork job in Canberra actually got a dedicated crew on it – they only seem to be there irregularly – eg, outside the ABS down Benjamin Way, Braybrooke Street, ginnederra Drive, GDE, top of Kings Avenue on Parkes Way etc etc etc. 🙁

rb 9:12 am 07 Jul 10

Well I would like to say a big thankyou to the road workers who signal to the stupid speeding drivers to slow down through the road work areas.

Not that it usually has any effect on these drivers

Related Articles

CBR Tweets

Sign up to our newsletter

Top
Copyright © 2017 Riot ACT Holdings Pty Ltd. All rights reserved.
www.the-riotact.com | www.b2bmagazine.com.au | www.thisiscanberra.com

Search across the site