The ABC reports that the Belconnen Way intersection of the Gungahlin Drive Extension will start opening upto traffic as of Tuesday 13th. Although that’s only a small part of the intersection, as the rest will be opened over the next 3 weeks. Roads ACT also say that the entire project (GDE+Glenloch) will be completed by June 2008.
You would think that they could opening it all up to traffic at the same time. Having a look at this intersection/flyover today, I noticed a strange design for people who live in Aranda. If you’re coming from the Glenloch Interchange and want to turn into Bandjalong Cres, you have drive under the Aranda bridge towards Belconnen Way and do a u-turn to come back up and over the Aranda bridge.